Inspection

Our AS9100 certified Quality Management System applies across all sectors at our technology centre in Derby.

To ensure our high standards are maintained, each of our products are inspected at different stages by our highly qualified inspection team, using the latest equipment.

Our quality inspectors measure all parts and check the finest details so that the final product corresponds with the engineering drawings and the dimensions and weights match the information received from our client.

The non conformances are raised using a Non Conformance Report (NCR) and follow our Corrective Action steps to resolve problems.

We undertake all relevant documentation such as First Article Inspection Reports (FAIR) and Production Parts Approval Process (PPAP), whilst issuing Certificates of Conformity (COC), if required.

  • FARO ARM
  • CMM
  • General Equipmentdsc_7572